Key outcomes

  • Cost savings of $2.7 million per annum

  • Total project value $5.5 million

  • 18 month payback period

  • Saves 5000 tonnes of CO2 per annum
     

ETS designed and installed modified exhaust systems to four existing gas generators, utilizing Miratech silencers, to capture enough waste heat for the creation of 5.6MW of additional mine cooling capacity via absorption chillers.
 
In concert with Gordon Brothers Industries, ETS designed and installed the necessary infrastructure to capture the waste heat from existing third party owned and operated gas fired generators converting it into 5.6MW of chilled water for use in the mine’s underground mine cooling system. The installation has been operating for close to one year and had an initial payback estimate of just over two years. This has now been revised to 18months and from there will save the mine $2.5M per annum in operation costs and reduce its emissions by 5000 Tonnes of CO2 per year.
 
This unique solution to underground mine cooling meant that the traditional and much more expensive methods of expanding mine cooling capacity were not needed. It comprises two 2.7 MW Thermax absorption chillers, new cooling water pipework, modified exhaust systems for four of the existing gas engines with new Miratech silencers to divert heat into the absorption chillers and significant civil infrastructure to house and support the new equipment. Construction commenced in September 2014 and was completed in late January 2015. It was completed on time and on budget with no interruption to mine operations.

 

 

Related Projects

GEM and Solar Manufacturing Business: Austchilli, Bundaberg

Key outcomes

  • 30% load reduction
  • Payback of 4-5 years (ahead of our predictions)
  • Cash-flow positive from the first quarter

Privately owned Austchilli is a leader in the food manufacturing industry, and the largest chilli company in Australia. Founded in 1995 and based in Bundaberg in regional Queensland, the vertically integrated farming agribusiness uses sustainable farming practices with products supplied to multi-national companies and the Australian market.

View Case Study

GEM and Hybrid Solar Schools: Bundaberg Christian College

Key outcomes

  • Savings of AUD$100,000 per on electricity
  • Reduced power usage by up to 80%
  • Payback period of seven years
  • Cash flow postitive from the first quarter
  • Over 400% return on investment before batteries need replacing
  • Savings over the life of the system around AUD$2,500,000
  • Generation of about AUD$20,000 in Large-Scale Generation Certificates (LGCs) per year

View Case Study

Immediate Improvement to Southern Colour’s Energy Efficiency with an SCE Voltage Stabilisation Unit

Key Outcomes

  • Energy reduction in kWh & kVa of more than 17%
  • Cost savings of more than 17%
  • Production at increased levels
  • Voltage reduced immediately from 253 Volts to 225 Volts

SCE worked with Southern Colour for several months to establish where they were using and wasting their energy in order to present them with the best possible energy reduction proposal. 

View Case Study

Wine Industry Game Changer - Voltage Stabilisation Reducing Energy Costs and Equipment Repairs Significantly at Alkoomi Wines

Key Outcomes

  • The supply of quality, pollution free voltage to the site
  • Energy reductions by more than 10%
  • Greatly improved site equipment performance with zero electromechanical stoppings

With continual equipment problems and interruptions to supply, the management at Alkoomi Wines investigated the root causes of the problems that they were experiencing on a daily basis with the supply of power to their southern Western Australian wine producing site.

View Case Study

ETS Installs SHARC Waste Water Heat Recovery for World's Largest Wool Tester

Key outcomes

  • $775k savings over 20 years
  • 37% reduction in gas consumption
  • 4.5 year 'simple' payback 

ETS provided AWTA with the patented SHARC heat recovery system, which captures waste heat that would otherwise be lost to sewerage each day. This heat recovery has resulted in a 37% saving in gas heating costs for AWTA, which will equate to an enormous $775k over 20 years. 

View Case Study

pitt&sherry Saves LaserBond Facility 125,000 kWh with Lighting Upgrade

Key Outcomes

  • 125,209 kWh per annum in energy savings
  • 1,500 energy savings certificates (ESCs)
  • ROI of 2.4 years
  • 120 tonnes of CO2 emmissions offset per annum

pitt&sherry (incorporating KMH Environmental) was commissioned to undertake an assessment of the energy savings opportunities at LaserBond’s Smeaton Grange facilities. The initial assessment focused on opportunities within their buildings services, where their factory lighting was an obvious choice.

View Case Study

Do you have a smart technology or solution?

Let the business community know about it!

Get in touch